280 design project
280 Traffic Engineering
traffice study 280
Highway Engineering 280

HWY 280 ACCESS MANAGEMENT PLAN

BIRMINGHAM, AL

This project was 28 intersection improvements along a 9 mile section of US 280 from Hollywood Blvd. to Doug Baker Blvd. The project consisted of indirect left turns, elimination of traffic signals, relocation of traffic signals and restriction of intersections. The project is estimated to reduce delay time as much as 65%, increase fuel efficiency by 50% and reduce commute time by 8-10 minutes a day.

x