Chesser Plantation
CHELSEA, AL
Master Planned 350 Lot Subdivision in Chelsea, AL.
Construction was phased into 4 phases. Property contained wetlands which were converted into a stormwater detention facility.
Responsible for Civil Engineering including:
- Site Layout
- Grading
- Stormwater Design
- Erosion Control
- Utilities
- Construction coordination